Crown Valley widening
ACL came and placed 220 ft of type 60 and 120 ft of type 736 brail. Directed Odonell to start repairs to drainage pipe, damaged during CIDH drilling. Spoke to Nadeem Srour and Sam Sukasian, geotech; MyLinh Duvan, hydraulics; Aun Tran, project engineer; Kenneth Oh and Bose P, district construction to try to come to a consensus on what the best way of dealing with the sign 100 foundation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment