skip to main | skip to sidebar

Oso Parkway 12-0E0704

Friday, March 20, 2009

405 and jeffrey sce permit

East side of bridge, Arizona Pipeline is cleaning out bottom of excavation for minor concrete on Monday.

Exposed rebar on left, they will remove and replace all areas where rebar was damaged

Foam to prevent concrete from entering bridge. Formed for concrete encasement

Sunday night they expect to place encasement, and slurry and sawcut additional area for repair

Monday they expect to install rebar and place concrete mix.

Witnessed an accident, cars collided under the bridge (based on noise) , one hit barrier rail and one went of the road to the right. Called it in to 911.

Posted by Unknown at 3:19 AM
Labels: sce permit

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Followers

Blog Archive

  • ▼  2009 (164)
    • ►  May (46)
    • ►  April (67)
    • ▼  March (37)
      • Multimedia message
      • Yesterday, weld xrays failed. Try again today. W...
      • Incorrect galv...will do tommorrow. Testing 2 out...
      • Multimedia message
      • from south curb at east joint 25.5', +30",+60",+86...
      • Multimedia message
      • gave safety meeting on scaffolding. Discussed for...
      • sce permit job
      • Sce permit, jeffrey
      • sce permit
      • Approach slab repair for sce project
      • Did not go to costa mesa meeting. discussed appro...
      • Finished Force account analysis for Vista Hermosa ...
      • SCE permit job
      • Came to office to work on force acct analysis for ...
      • 405 and jeffrey sce permit
      • permit 405 and Jeffrey
      • review sign structure for 55 widening
      • east side
      • west side
      • west side
      • 1/2 Settling in soil surrounding bridge caused pip...
      • 2/2 ft base all over struct backfill to bottom of ...
      • 1/2 m-W : winter trainingThurs-getting permit appr...
      • 2/2 approved by 2pm. Sce chose to shut off work ...
      • Multimedia message
      • Multimedia message
      • Training winter....mon pm thru weds am went to off...
      • Multimedia message
      • Multimedia message
      • Sign submittal 55 widening, files for hermosa, sr ...
      • Yesterday got cert for kelly ball and concr sampli...
      • Multimedia message
      • Multimedia message
      • cool clear
      • Multimedia message
      • Multimedia message
    • ►  February (14)

About Me

Unknown
View my complete profile