Thursday, April 30, 2009

Pour stopped after 147 yd3 due to dirty aggr. Integrity on site working on rw1 footing steel.

SCE PERMIT JOB

Completed diaries as requested by Shahryar Daravi.
Met with Jose Berrios to discuss vista hermosa, contractor requests for days/money

Wednesday, April 29, 2009

Multimedia message

Integrity just left

Multimedia message

Integrity: dennis, giovanni rivera yesterday too...6 guys same as ystdy

Multimedia message

Als crew, integrity continueing work on rw3

Tuesday, April 28, 2009

Contractors mtg. Started sr diary for victor. Caught up concretr pour records. Discussed barrier rail issue w bose

--
==================================================================
This mobile text message is brought to you by AT&T

Monday, April 27, 2009

Multimedia message

Begin forming to 13+63 oso
Cloudy cool...als guys dennis mcguire and giovanni riviera from integrity start footing for rw1 template up from 10+82 to 13+30

--
==================================================================
This mobile text message is brought to you by AT&T

Friday, April 24, 2009

--
==================================================================
This mobile text message is brought to you by AT&T

Thursday, April 23, 2009

1/2 Sorry we got disconnected. They are working @ rw3 footing and rw1 stem for sat pm pour. Will shoot grades friday day. Have

--
==================================================================
This mobile text message is brought to you by AT&T

2/2 a ton if diaries for u :)....

--
==================================================================
This mobile text message is brought to you by AT&T

Done

--
==================================================================
This mobile text message is brought to you by AT&T

39 rw1 remainder rw 2. test taken load 3 . Shoot grades friday day.

--
==================================================================
This mobile text message is brought to you by AT&T

Wednesday, April 22, 2009

Multimedia message

Start @ rw 2
Aurelio jesus hugo + pauls crew

--
==================================================================
This mobile text message is brought to you by AT&T

Saturday, April 18, 2009

Friday, April 17, 2009

Thursday, April 16, 2009

Multimedia message

Rw 2 first 96 ft

Multimedia message

Abut 3 footing
1/2 Place 96 ft rw 2. Footing abut 3 paul navarro, basilio bernardo(4) juan owen(4) mark martin: lab for aurelio arevalo, cm eric

--
==================================================================
This mobile text message is brought to you by AT&T

2/2 camacho, cm hugo cabrerra, lab jesus viramontes, merli 28 m pump - bruce steiner pump operator

--
==================================================================
This mobile text message is brought to you by AT&T

1/3 Crown no district work. Sched testing. bose said he would handle from now until steel for brail goes in.
55 widening Asked k

--
==================================================================
This mobile text message is brought to you by AT&T

3/3 ked to meet with nabil

--
==================================================================
This mobile text message is brought to you by AT&T

2/3 arim about sign struct.
Oso chked rw 2 abut 3 footing for pour tonight, completed materials on hand
irvine approach slabs - as

--
==================================================================
This mobile text message is brought to you by AT&T

Wednesday, April 15, 2009

Oso-no work during day for pauls crew. terry backfilled around sign 5. tonight will strip forms and worl on assembling signs

--
==================================================================
This mobile text message is brought to you by AT&T

Multimedia message

paul navarro 16 hours, basilio juan martin: lab for aurelio arevalo, cm eric camacho, cm hugo cabrerra, lab jesus viramontes, merli 28 m pump - steiner pump operator 4hours for all but pauls crew 8 hours for them

Tuesday, April 14, 2009

Mark, juan RW2: paul: owen bernardo sign bolts

--
==================================================================
This mobile text message is brought to you by AT&T

Hi Paul, Chked footing

Crown rw1 footing
1st step clr to soil ..need to pop out forms evrywhere..2nd step-top mat out of pour: clean out bottom

Multimedia message

Clr vert at 15+01, gaps in forms 13+77

Multimedia message

Clr vert at 15+01, gaps in forms 13+77

Multimedia message

Backfill operation @ crown deere excav jesse gonzales eric alvarez ernie ventura everardo zuniga neil-9097725042 dan from ct

Monday, April 13, 2009

Backfill operation @ crown deere excav jesse gonzalesL eric alvarezL ernie venturaL everardo zunigaF Testing scheduled for tomorrow at 8:00am

--
==================================================================
This mobile text message is brought to you by AT&T

FW:

Top steel back, bottom steel front

Multimedia message

Forming at rw 2 - trench box section basilio martin mark owen bernardo....not juan

Multimedia message

Oso rw 1 - integrity rebar placers, footing steel 13+25 to end ; dennis mcguireF scott wheatonI, ryan youmansI, giovanni rivieraI ; T16W 18OC
Crown valley-backfill operation ready for test in pm?

--
==================================================================
This mobile text message is brought to you by AT&T

Friday, April 10, 2009

2/2 nd time sheet, filing hermosa, struct backfill insp requ for crown

--
==================================================================
This mobile text message is brought to you by AT&T

1/2 Rw 3 tow grades and weephole elevs for oso, fills for brail crown, irenes cat 48 filing skeleton, need to do daries for oso a

--
==================================================================
This mobile text message is brought to you by AT&T

Multimedia message

Crown shooting tow grades for barrier acl. Electrical then ironworkers, clean up : msl electric-tim sullivan f, jeff? elec, manuel villagrana elec: o'donnell prime everardo zuniga- foreman, Jesse gonzalez, ernest ventura,

united rentals wacker, water buffalo trailer
sam ct elec came out

Raining hard

--
==================================================================
This mobile text message is brought to you by AT&T

Thursday, April 9, 2009

3/3 ce from outside. Surveys to come tomorrow give another copy of grades for weephole and tow

--
==================================================================
This mobile text message is brought to you by AT&T

1/3 owen teeter c, martin vasquez ca, basillio pecheco c, bernardo gatica c, juan miranda ca, multiquip 5000 generator, wrk truck

--
==================================================================
This mobile text message is brought to you by AT&T

2/3 mark navarro 12pm to?

Issue w surveys looks like 1 set of takes moved over 1/2 foot. Told paul to ignore use measured distan

--
==================================================================
This mobile text message is brought to you by AT&T

10 cores taken to twinings , 2 at 14 21 28 42 days.

--
==================================================================
This mobile text message is brought to you by AT&T

Wednesday, April 8, 2009

Multimedia message

Excavator damaged electrical wiring, Moore electric out to fix

Still need clean out, keyway raveling, steps not sharp

Tuesday, April 7, 2009

Multimedia message

Forming rw1 from e0 owen teeter c- gave tow grades, martin vasquez ca, basillio pecheco c, bernardo gatica c, juan miranda ca, multiquip 5000 generator, wrk truck

Monday, April 6, 2009

Met w andy to discuss future work...covering for Bijan day/night, Hamid starting next week

Oso, top of wall grades for RW1

Friday, April 3, 2009

Today

Oso RW grades. Drew up on Microstation, Approved Sign submittal for 55 widening - Discussed with Karim, diary for Neelima's sign job,

Thursday, April 2, 2009

Multimedia message

Done 300 start 400, anither crew place steel 500
Zach plagenza fore
raul and freddy martinez tds
john forrester op
batista lab
jose lasaro lab
clancy demitt sup

--
==================================================================
This mobile text message is brought to you by AT&T

Starting at loc 300 now cool clear 49 degrees

--
==================================================================
This mobile text message is brought to you by AT&T

1/3 Arrow sign on work truck w/ zach, 3 laborers, zach foreman, tds engineering, mehaffey companies drill rig (anging drill. 5' a

--
==================================================================
This mobile text message is brought to you by AT&T

3/3 , hertz 4200 international dump truck

--
==================================================================
This mobile text message is brought to you by AT&T

2/3 uger 3' core barrel ) and operator, 1 drill foreman , F250 pickup, F550 work truck. Hertz bobcat S185 Skidsteer w dozer attach

--
==================================================================
This mobile text message is brought to you by AT&T

24 wide diam auger. Got through bad stuff at 17 ft.

--
==================================================================
This mobile text message is brought to you by AT&T

Multimedia message

1' by 2' piece of rubble

Multimedia message

Rubble ac pcc rebar at 16 sit 500

Multimedia message

LOCATION 500: Hard drilling at 16....chunks of concrete and AC.

Multimedia message

Left jeffrey at 12:30 now sign job

Multimedia message

4.08 rock 2.82 sand

Multimedia message

Rapid set truck broke midway thru. Removed cage, concrete, reinstalled. Repoured.

Wednesday, April 1, 2009

Multimedia message

Multimedia message

Redo test send in request to test dirt first thing am

Multimedia message

Reminded to push down tie wire at face of wall. Reminded them of expansion joint. Looks good. Forming in bac at bottom at weakened plane joints, not flush.

Multimedia message

Install steel for rw 2 corner cabot and oso